Junction Hill School has approximately 75 sheets of Metal that was removed from the Hart Building Bus Barn. These sheets are approximately 24' long. We are accepting sealed bids that will be opened at our April Board Meeting. If interested in looking at the metal please contact the school to view the material. Metal will be sold in 1 lot as a whole.
Used Roof Metal For Sale
March 8, 2019